Portbury Wharf WRC

Location: Portbury

Project Type: Flood Alleviation

Client: Wessex Water

Project Duration: 24 weeks

Contract Value: £1,050,000

Portbury Wharf WRC is located behind the Severn Estuary Sea wall. The height of the sea wall is insufficient to protect against high spring tides and was overtopped along the entire length of the bank during March 2020. The flood inundated the surrounding land including the WRC, causing extensive damage.

In anticipation of very high astronomical tides in the future and the ongoing deterioration of the sea wall, Wessex Water were at significant risk of property damage, as such it was proposed to provide a sea defence around the whole perimeter of Portbury Wharf WRC to a height of 9.5mOD, providing flood resilience, these works include:

  • Installation of plastic sheet pile wall with gabions.
  • Design & Installation of precast wall units including RC Foundation and appropriate earthworks.
  • Installation of an earthwork bund.
  • Design & Installation of vehicle and pedestrian flood defence gates.

During the ECI phase, LCE implemented a Two-Stage Proposal report; the Stage 1 report detailed the proposed process, potential construction options, key project risks and anticipated timeframe for delivery of ECI.

Whilst the Stage 2 report assessed the potential options and risks highlighted in the Stage 1 report (in terms of Safety, Quality, Time and Cost).

This allowed the client and design team to make informed decisions relating to a solution to meet the unique set of challenges provided by the scheme. The successful handover of the scheme to budget and a tight programme is not only testament to the skill and dedication of the direct delivery team but also demonstrates the benefit of ECI. This early engagement has resulted in a solution that provided optimal constructability and ensured that pre-planning requirements of third parties such as the EA and Natural England were satisfied.

Works

Explore related projects

View All
Holdenhurst WRC

Holdenhurst WRC

A £30 million investment by Wessex Water to protect Bournemouth's popular beaches

Location: Bournemouth

Project Type: Water Treatment

Client: Wessex Water

Project Duration: 24 months

Contract Value: £14.5m

Read More
Holly Hedge Animal Sanctuary

Holly Hedge Animal Sanctuary

Its amazing to see how our time can benefit the sanctuary and its residents.

Location: Holly Hedge Animal Sanctuary

Project Type: ESG

Client: Community Volunteering

Project Duration: 1 day!

Contract Value: £0

Read More

Proud to work with