Location: West Huntspill, Somerset
Project Type: Bathing Water Improvements
Client: Wessex Water
Project Duration: 100 weeks
Contract Value: £5m
The scheme consisted of the following elements for which we were Principal Contractor and provided civil engineering expertise: –
As a water industry specialist with almost 40 years of experience, we have a detailed understanding of operational need and aim to minimise disruption and risk to consent. The site remained operational throughout the construction period and the work was controlled to ensure a safe working environment for not only the construction team but the operators.
The scheme required engagement with a large number of stakeholders including the designers, the framework M&E partner, local residents and Wessex Water operations. Envolve together with the scheme designer SWECO and Wessex Water (WECS) jointly developed the scheme from the optioneering stage, through to detailed design and into construction.
Envolve worked closely with the design partner to review constructability and the most suitable solution for the various structures to be constructed as part of the scheme including in-situ or precast construction for the ASP lanes, bottom-up or top-down caisson shaft for the RAS/SAS pumping station. The result was a solution that achieved results in every element of Safety, Quality, Time & Cost—our underlying business ethos.
Envolve worked closely with the Wessex Water environmental team to deliver a scheme rated as having a high environmental/planning sensitivity. The WRC is adjacent to Severn Estuary Special Protection Area (SPA) and Bridgwater Bay Site of Special Scientific Interest (SSSI) and National Nature Reserve (NNR); therefore significant up-front planning was required prior to commencement.
We also worked with the various stakeholders to develop a Material Management Plan that was in accordance with the CL:AIRE principles.
Including:
The Construction phase of the scheme is on target for completion during December 2020, in advance of the EA regulatory output date at the end ofMarch 2021.
Whilst focus remains on completion of the core civils scope during Summer 2020, the scheme has offered demonstration of our best practices including a fully documented Inspection & Test Plan, Health & Safety initiatives and collaborative working with the M&E partner and other stakeholders.
Holdenhurst WRC
A £30 million investment by Wessex Water to protect Bournemouth's popular beaches
Location: Bournemouth
Project Type: Water Treatment
Client: Wessex Water
Project Duration: 24 months
Contract Value: £14.5m
Holly Hedge Animal Sanctuary
Its amazing to see how our time can benefit the sanctuary and its residents.
Location: Holly Hedge Animal Sanctuary
Project Type: ESG
Client: Community Volunteering
Project Duration: 1 day!