Location: Portbury
Project Type: Flood Alleviation
Client: Wessex Water
Project Duration: 24 weeks
Contract Value: £1,050,000
In anticipation of very high astronomical tides in the future and the ongoing deterioration of the sea wall, Wessex Water were at significant risk of property damage, as such it was proposed to provide a sea defence around the whole perimeter of Portbury Wharf WRC to a height of 9.5mOD, providing flood resilience, these works include:
Whilst the Stage 2 report assessed the potential options and risks highlighted in the Stage 1 report (in terms of Safety, Quality, Time and Cost).
This allowed the client and design team to make informed decisions relating to a solution to meet the unique set of challenges provided by the scheme. The successful handover of the scheme to budget and a tight programme is not only testament to the skill and dedication of the direct delivery team but also demonstrates the benefit of ECI. This early engagement has resulted in a solution that provided optimal constructability and ensured that pre-planning requirements of third parties such as the EA and Natural England were satisfied.
Holdenhurst WRC
A £30 million investment by Wessex Water to protect Bournemouth's popular beaches
Location: Bournemouth
Project Type: Water Treatment
Client: Wessex Water
Project Duration: 24 months
Contract Value: £14.5m
Holly Hedge Animal Sanctuary
Its amazing to see how our time can benefit the sanctuary and its residents.
Location: Holly Hedge Animal Sanctuary
Project Type: ESG
Client: Community Volunteering
Project Duration: 1 day!
Contract Value: £0